| 1. | If the structure is elastic the force-displacement curve follows the same path on loading and unloading . 如果该结构为弹性者,那么在加载和卸载时力位移曲线遵循相同的迹线。 |
| 2. | Simulation on load variation of combined cycle by ann 蒸气联合循环的神经网络变工况模拟 |
| 3. | Study on load control and management system based on gsm gprs 的负荷控制管理系统的研制 |
| 4. | Introduction on load forecasting method based on data mining 基于数据挖掘的负荷预测初探 |
| 5. | Research on load transfer law of cement - soil composite pile 水泥土组合桩荷载传递规律研究 |
| 6. | Survey on load control algorithm of radio resource management 无线资源管理中负载控制算法的研究 |
| 7. | Technology parameter of scb9 10kv on load tap changing transformer Scb9系列10kv级有载调压变压器 |
| 8. | Check for consistent line endings on load 加载时检查一致的行尾 |
| 9. | Technology parameter of scb10 10kv on load tap changing transformer Scb10系列10kv级有载调压变压器 |
| 10. | Study on load of the self - propelled guns during firing in travelling 自行火炮行进间射击时的受载研究 |